Passage Data · Check a report · Use it from your AI

Whitney Point (V)

Sewage treatment plant, Whitney Point, New York. NPDES permit NY0262552, in force until Feb 28, 2031. Last 12 months: over a limit once (last July 2026), 10 required values missing. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form M monthly (40 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
July 2026Coliform, fecal general, 7-day geometric mean2400 #/100mL≤ 400 #/100mL500%

Limits in force (40)

ParameterStatisticLimitMonths
Temperature, water deg. centigrademonthly averagereport only (deg C)all year
Temperature, water deg. centigradedaily maximumreport only (deg C)all year
Temperature, water deg. centigrademonthly averagereport only (deg C)all year
Temperature, water deg. centigradedaily maximumreport only (deg C)all year
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. C7-day average≤ 45 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 37.5 lb/dall year
BOD, 5-day, 20 deg. C7-day average≤ 56.3 lb/dall year
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
BOD, 5-day, 20 deg. C7-day averagereport only (mg/L)all year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
pHminimumreport only (SU)all year
pHmaximumreport only (SU)all year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspended7-day average≤ 45 mg/Lall year
Solids, total suspendedmonthly average≤ 37.5 lb/dall year
Solids, total suspended7-day average≤ 56.3 lb/dall year
Solids, total suspendedmonthly averagereport only (mg/L)all year
Solids, total suspended7-day arithmetic meanreport only (mg/L)all year
Solids, settleabledaily maximum≤ .3 mL/Lall year
Solids, settleabledaily maximumreport only (mL/L)all year
Nitrogen, total [as N]monthly averagereport only (mg/L)all year
Nitrogen, total [as N]rolling average≤ 8 mg/Lall year
Nitrogen, ammonia total [as N]monthly averagereport only (mg/L)all year
Nitrogen, ammonia total [as N]monthly averagereport only (mg/L)all year
Nitrogen, nitrite total [as N]monthly averagereport only (mg/L)all year
Nitrogen, nitrite total [as N]monthly averagereport only (mg/L)all year
Nitrogen, nitrate total [as N]monthly averagereport only (mg/L)all year
Nitrogen, nitrate total [as N]monthly averagereport only (mg/L)all year
Nitrogen, Kjeldahl, total [as N]monthly averagereport only (mg/L)all year
Nitrogen, Kjeldahl, total [as N]monthly averagereport only (mg/L)all year
Phosphorus, total [as P]monthly averagereport only (mg/L)all year
Flow, in conduit or thru treatment plantmonthly average≤ .15 MGDall year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualdaily maximum≤ 2 mg/LJun–Sep
Coliform, fecal general30-day geometric mean≤ 200 #/100mLJun–Sep
Coliform, fecal general7-day geometric mean≤ 400 #/100mLJun–Sep
BOD, 5-day, percent removalmonthly average minimum≥ 85 %all year
Solids, suspended percent removalmonthly average minimum≥ 85 %all year

Cited limits by parameter: New York's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NY0262552 · MCP: https://passage-data.com/mcp