Passage Data · Check a report · Use it from your AI

Catskill (V)

Water Supply, Earlton, New York. NPDES permit NY0261076, in force until Sep 30, 2029. Last 12 months: over a limit 5 times (last September 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form M monthly (12 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
November 2025Flow rate, monthly average.27 MGD≤ .25 MGD8%
August 2026Flow rate, monthly average.31 MGD≤ .25 MGD24%
September 2026Aluminum, total [as Al], daily maximum4.67 mg/L≤ 4 mg/L17%
September 2026Aluminum, total [as Al], monthly average4.67 mg/L≤ 2 mg/L134%
September 2026Solids, total suspended, monthly average27 mg/L≤ 20 mg/L35%

Limits in force (12)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheitdaily maximum≤ 70 deg F (alert, not enforceable)all year
Flow ratemonthly average≤ .25 MGDall year
pHminimum≥ 6.5 SUall year
pHmaximum≤ 8.5 SUall year
Solids, total suspendedmonthly average≤ 20 mg/Lall year
Solids, total suspendeddaily maximum≤ 40 mg/Lall year
Solids, settleabledaily maximum≤ .1 mL/Lall year
Iron, total [as Fe]monthly average≤ 2 mg/Lall year
Iron, total [as Fe]daily maximum≤ 4 mg/Lall year
Aluminum, total [as Al]monthly average≤ 2 mg/Lall year
Aluminum, total [as Al]daily maximum≤ 4 mg/Lall year
Chlorine, total residualdaily maximum≤ .1 mg/Lall year

How strict are these limits?

Cited limits by parameter: New York's rules and the federal ones.

Same industry: the 53 Water Supply permits in New York.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NY0261076 · MCP: https://passage-data.com/mcp