Passage Data · Check a report · Use it from your AI
Electric Services, Hume, New York. NPDES permit NY0242896, in force until Feb 29, 2028. Last 12 months: no values over a limit, 8 of 48 reports late. Source: EPA ECHO, Oct 22, 2026.
| Parameter | Statistic | Limit | Months | Outfall |
|---|---|---|---|---|
| Temperature, water deg. fahrenheit | daily maximum | ≤ 90 deg F | all year | 001 |
| Flow rate | daily average | report only (gal/d) | all year | 001 |
| Flow rate | daily maximum | report only (gal/d) | all year | 001 |
| pH | minimum | ≥ 6 SU | all year | 001 |
| pH | maximum | ≤ 9 SU | all year | 001 |
| Solids, total suspended | daily maximum | ≤ 100 mg/L | all year | 001 |
| Solids, settleable | daily maximum | ≤ .3 mL/L | all year | 001 |
| Phosphorus, total [as P] | daily maximum | ≤ 1 mg/L | all year | 001 |
| Flow rate | daily maximum | report only (gal/d) | all year | 01A |
| Oil & Grease | daily maximum | ≤ 15 mg/L | all year | 01A |
| Flow rate | daily maximum | report only (gal/d) | all year | 01B |
| pH | minimum | ≥ 6 SU | all year | 01B |
| pH | maximum | ≤ 9 SU | all year | 01B |
| Oil & Grease | daily maximum | ≤ 15 mg/L | all year | 01B |
| Flow rate | daily maximum | report only (gal/d) | all year | 01C |
| Chlorine, total residual | daily maximum | ≤ .1 mg/L | all year | 01C |
Cited limits by parameter: New York's rules and the federal ones.
Same industry: the 39 Electric Services permits in New York.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/NY0242896 · MCP: https://passage-data.com/mcp