Passage Data · Check a report · Use it from your AI

Blooming Grove (T)

Sewage treatment plant, Blooming Grove, New York. NPDES permit NY0215457, in force until Aug 31, 2030. Last 12 months: over a limit 13 times (last August 2026), 4 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form M monthly (21 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
14 values over a limit, 0 required values missing, 2 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

All 13 values over a limit
Period endingParameterReportedLimitOver by
November 2025Oxygen, dissolved [DO], daily minimum6.3 mg/L≥ 7 mg/L10%
November 2025Solids, suspended percent removal, monthly average minimum83.57 %≥ 85 %10%
November 2025Solids, total suspended, daily maximum12.9 mg/L≤ 10 mg/L29%
December 2025Oxygen, dissolved [DO], daily minimum6.46 mg/L≥ 7 mg/L8%
January 2026Solids, suspended percent removal, monthly average minimum81.19 %≥ 85 %25%
January 2026pH, maximum8.9 SU≤ 8.5 SU—
June 2026Coliform, fecal general, 30-day geometric mean285 #/100mL≤ 200 #/100mL43%
June 2026Solids, suspended percent removal, monthly average minimum82.6 %≥ 85 %16%
June 2026Solids, total suspended, daily maximum2 lb/d≤ 1 lb/d100%
June 2026Solids, total suspended, daily maximum25 mg/L≤ 10 mg/L150%
July 2026Oxygen, dissolved [DO], daily minimum6.4 mg/L≥ 7 mg/L9%
July 2026Solids, total suspended, daily maximum10.3 mg/L≤ 10 mg/L3%
August 2026Oxygen, dissolved [DO], daily minimum6.8 mg/L≥ 7 mg/L3%

Limits in force (22)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)all year
Flow ratemonthly average≤ 12000 gal/dall year
Oxygen demand, ultimatedaily maximum≤ 55 mg/Lall year
Oxygen demand, ultimatedaily maximum≤ 5.5 lb/dall year
Oxygen, dissolved [DO]daily minimum≥ 7 mg/Lall year
pHminimum≥ 6.5 SUall year
pHmaximum≤ 8.5 SUall year
Solids, total suspendeddaily maximum≤ 10 mg/Lall year
Solids, total suspendeddaily maximum≤ 1 lb/dall year
Solids, total suspendeddaily maximumreport only (mg/L)all year
Solids, total suspendeddaily maximumreport only (lb/d)all year
Solids, settleabledaily maximum≤ .1 mL/Lall year
Nitrogen, ammonia total [as N]monthly average≤ 1.2 mg/LJun–Oct
Nitrogen, ammonia total [as N]monthly average≤ 1.7 mg/LJan, Feb, Mar, Apr, May, Nov, Dec
Nitrogen, Kjeldahl, total [as N]monthly averagereport only (mg/L)all year
Chlorine, total residualdaily maximum≤ .03 mg/LMay–Oct
Coliform, fecal general30-day geometric mean≤ 200 #/100mLMay–Oct
Coliform, fecal general7-day geometric mean≤ 400 #/100mLMay–Oct
BOD, carbonaceous [5 day, 20 C]daily maximumreport only (mg/L)all year
BOD, carbonaceous [5 day, 20 C]daily maximumreport only (mg/L)all year
Solids, suspended percent removalmonthly average minimum≥ 85 %all year
Carbonaceous oxygen demand, % removalmonthly average minimum≥ 85 %all year

How strict are these limits?

Cited limits by parameter: New York's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NY0215457 · MCP: https://passage-data.com/mcp