Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Au Sable Forks, New York. NPDES permit NY0201910, in force until Jan 31, 2031. Last 12 months: over a limit 3 times (last May 2026), 3 required values missing, 2 of 12 reports late. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| May 2026 | Coliform, fecal general, 30-day geometric mean | 430.6 #/100mL | ≤ 200 #/100mL | 115% |
| May 2026 | Coliform, fecal general, 7-day geometric mean | 501.2 #/100mL | ≤ 400 #/100mL | 25% |
| May 2026 | Solids, settleable, daily maximum | .4 mL/L | ≤ .3 mL/L | 33% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Temperature, water deg. fahrenheit | daily maximum | report only (deg F) | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | 7-day average | ≤ 45 mg/L | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 37 lb/d | all year |
| BOD, 5-day, 20 deg. C | 7-day average | ≤ 55 lb/d | all year |
| BOD, 5-day, 20 deg. C | monthly average | report only (mg/L) | all year |
| BOD, 5-day, 20 deg. C | monthly average | report only (lb/d) | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Solids, total suspended | monthly average | ≤ 30 mg/L | all year |
| Solids, total suspended | 7-day average | ≤ 45 mg/L | all year |
| Solids, total suspended | monthly average | ≤ 37 lb/d | all year |
| Solids, total suspended | 7-day average | ≤ 55 lb/d | all year |
| Solids, total suspended | monthly average | report only (mg/L) | all year |
| Solids, total suspended | monthly average | report only (lb/d) | all year |
| Solids, settleable | daily maximum | ≤ .3 mL/L | all year |
| Nitrogen, ammonia total [as N] | monthly average | report only (mg/L) | all year |
| Phosphorus, total [as P] | monthly average | report only (mg/L) | all year |
| Phosphorus, total [as P] | rolling average | ≤ 4.47 lb/d | all year |
| Flow, in conduit or thru treatment plant | monthly average | ≤ .147 MGD | all year |
| Chlorine, total residual | daily maximum | ≤ .05 mg/L | May–Oct |
| Mercury, total [as Hg] | daily maximum | ≤ 50 ng/L | all year |
| Coliform, fecal general | 30-day geometric mean | ≤ 200 #/100mL | May–Oct |
| Coliform, fecal general | 7-day geometric mean | ≤ 400 #/100mL | May–Oct |
| BOD, 5-day, percent removal | monthly average minimum | ≥ 85 % | all year |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | all year |
Cited limits by parameter: New York's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/NY0201910 · MCP: https://passage-data.com/mcp