Passage Data · Check a report · Use it from your AI

Wheelabrator Westchester L.P.

Refuse Systems, Peekskill, New York. NPDES permit NY0109690, in force until Jun 30, 2031. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form C monthly (12 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 1 of 12 reports late

Limits in force (14)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheitmonthly averagereport only (deg F)May, Jun
Temperature, water deg. fahrenheitmonthly averagereport only (deg F)Jan, Feb, Mar, Apr, Jul, Aug, Sep, Oct, Nov, Dec
Temperature, water deg. fahrenheitdaily maximum≤ 93.2 deg FMay, Jun
Temperature, water deg. fahrenheitdaily maximum≤ 105 deg FJan, Feb, Mar, Apr, Jul, Aug, Sep, Oct, Nov, Dec
Temperature, water deg. fahrenheitmonthly averagereport only (deg F)all year
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)all year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
Temperature rise, length of excursiondaily maximumreport only (hr)all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximum≤ 55 MGDall year
Chlorine, total residualdaily maximum≤ .2 mg/Lall year
Temp. diff. between intake and dischargemonthly averagereport only (deg F)all year
Temp. diff. between intake and dischargedaily maximum≤ 25 deg Fall year

How strict are these limits?

Cited limits by parameter: New York's rules and the federal ones.

Same industry: the 21 Refuse Systems permits in New York.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NY0109690 · MCP: https://passage-data.com/mcp