Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Williamson, New York. NPDES permit NY0108723, in force until Feb 28, 2027. Last 12 months: over a limit 6 times (last August 2026). Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| March 2026 | Flow, in conduit or thru treatment plant, 30-day arithmetic mean | .846 MGD | ≤ .625 MGD | 35% |
| April 2026 | Flow, in conduit or thru treatment plant, 30-day arithmetic mean | .789 MGD | ≤ .625 MGD | 26% |
| August 2026 | BOD, 5-day, 20 deg. C, 30-day average | 34 mg/L | ≤ 30 mg/L | 13% |
| August 2026 | BOD, 5-day, 20 deg. C, 7-day average | 56 mg/L | ≤ 45 mg/L | 24% |
| August 2026 | BOD, 5-day, percent removal, monthly average minimum | 83 % | ≥ 85 % | 13% |
| August 2026 | pH, minimum | 5.4 SU | ≥ 6 SU | — |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Temperature, water deg. centigrade | daily maximum | report only (deg C) | all year |
| Temperature, water deg. centigrade | daily maximum | report only (deg C) | all year |
| BOD, 5-day, 20 deg. C | 30-day average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | 7-day average | ≤ 45 mg/L | all year |
| BOD, 5-day, 20 deg. C | 30-day average | ≤ 156 lb/d | all year |
| BOD, 5-day, 20 deg. C | 7-day average | ≤ 234 lb/d | all year |
| BOD, 5-day, 20 deg. C | 30-day average | report only (mg/L) | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| pH | minimum | report only (SU) | all year |
| pH | maximum | report only (SU) | all year |
| Solids, total suspended | 30-day average | ≤ 30 mg/L | all year |
| Solids, total suspended | 7-day average | ≤ 45 mg/L | all year |
| Solids, total suspended | 30-day average | ≤ 156 lb/d | all year |
| Solids, total suspended | 7-day average | ≤ 234 lb/d | all year |
| Solids, total suspended | 30-day average | report only (mg/L) | all year |
| Solids, settleable | daily maximum | ≤ .3 mL/L | all year |
| Solids, settleable | daily maximum | report only (mL/L) | all year |
| Flow, in conduit or thru treatment plant | 30-day arithmetic mean | ≤ .625 MGD | all year |
| Chlorine, total residual | daily maximum | ≤ .25 mg/L | all year |
| Coliform, fecal general | 30-day geometric mean | ≤ 200 #/100mL | all year |
| Coliform, fecal general | 7-day geometric mean | ≤ 400 #/100mL | all year |
| BOD, 5-day, percent removal | monthly average minimum | ≥ 85 % | all year |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | all year |
Cited limits by parameter: New York's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/NY0108723 · MCP: https://passage-data.com/mcp