Passage Data · Check a report · Use it from your AI

Belmont (V)

Sewage treatment plant, Belmont, New York. NPDES permit NY0031844, in force until Jun 30, 2029. Last 12 months: over a limit 3 times (last April 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form M monthly (30 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
3 values over a limit, 0 required values missing, 0 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
October 2025Coliform, fecal general, 30-day geometric mean201 #/100mL≤ 200 #/100mL1%
March 2026Flow, in conduit or thru treatment plant, monthly average.289 MGD≤ .215 MGD34%
April 2026Flow, in conduit or thru treatment plant, monthly average.333 MGD≤ .215 MGD55%

Limits in force (30)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)all year
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)all year
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. C7-day average≤ 45 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 54 lb/dall year
BOD, 5-day, 20 deg. C7-day average≤ 81 lb/dall year
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
BOD, 5-day, 20 deg. C7-day averagereport only (mg/L)all year
BOD, 5-day, 20 deg. Cmonthly averagereport only (lb/d)all year
BOD, 5-day, 20 deg. C7-day averagereport only (lb/d)all year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
pHminimumreport only (SU)all year
pHmaximumreport only (SU)all year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspended7-day average≤ 45 mg/Lall year
Solids, total suspendedmonthly average≤ 54 lb/dall year
Solids, total suspended7-day average≤ 81 lb/dall year
Solids, total suspendedmonthly averagereport only (mg/L)all year
Solids, total suspended7-day averagereport only (mg/L)all year
Solids, total suspendedmonthly averagereport only (lb/d)all year
Solids, total suspended7-day averagereport only (lb/d)all year
Solids, settleabledaily maximum≤ .3 mL/Lall year
Solids, settleabledaily maximumreport only (mL/L)all year
Phosphorus, total [as P]30-day average≤ 1 mg/Lall year
Flow, in conduit or thru treatment plantmonthly average≤ .215 MGDall year
Coliform, fecal general30-day geometric mean≤ 200 #/100mLall year
Coliform, fecal general7-day geometric mean≤ 400 #/100mLall year
BOD, 5-day, percent removalmonthly average minimum≥ 85 %all year
Solids, suspended percent removalmonthly average minimum≥ 85 %all year

Cited limits by parameter: New York's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NY0031844 · MCP: https://passage-data.com/mcp