Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Dexter, New York. NPDES permit NY0031461, in force until Aug 31, 2031. Last 12 months: over a limit 6 times (last September 2026), 1 of 12 reports late. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| October 2025 | BOD, 5-day, 20 deg. C, monthly average | 35 mg/L | ≤ 30 mg/L | 17% |
| June 2026 | BOD, 5-day, percent removal, monthly average minimum | 83 % | ≥ 85 % | 13% |
| June 2026 | Solids, suspended percent removal, monthly average minimum | 77 % | ≥ 85 % | 53% |
| June 2026 | Solids, total suspended, 7-day average | 96.7 lb/d | ≤ 94 lb/d | 3% |
| June 2026 | Solids, total suspended, monthly average | 96.7 lb/d | ≤ 63 lb/d | 53% |
| September 2026 | BOD, 5-day, percent removal, monthly average minimum | 80 % | ≥ 85 % | 33% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Temperature, water deg. fahrenheit | daily maximum | report only (deg F) | all year |
| Temperature, water deg. fahrenheit | daily maximum | report only (deg F) | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | 7-day average | ≤ 45 mg/L | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 63 lb/d | all year |
| BOD, 5-day, 20 deg. C | 7-day average | ≤ 94 lb/d | all year |
| BOD, 5-day, 20 deg. C | monthly average | report only (mg/L) | all year |
| BOD, 5-day, 20 deg. C | 7-day average | report only (mg/L) | all year |
| BOD, 5-day, 20 deg. C | monthly average | report only (lb/d) | all year |
| BOD, 5-day, 20 deg. C | 7-day average | report only (lb/d) | all year |
| pH | daily minimum | ≥ 6 SU | all year |
| pH | daily maximum | ≤ 9 SU | all year |
| pH | daily minimum | report only (SU) | all year |
| pH | daily maximum | report only (SU) | all year |
| Solids, total suspended | monthly average | ≤ 30 mg/L | all year |
| Solids, total suspended | 7-day average | ≤ 45 mg/L | all year |
| Solids, total suspended | monthly average | ≤ 63 lb/d | all year |
| Solids, total suspended | 7-day average | ≤ 94 lb/d | all year |
| Solids, total suspended | monthly average | report only (mg/L) | all year |
| Solids, total suspended | 7-day average | report only (mg/L) | all year |
| Solids, total suspended | monthly average | report only (lb/d) | all year |
| Solids, total suspended | 7-day average | report only (lb/d) | all year |
| Solids, settleable | daily maximum | ≤ .3 mL/L | all year |
| Solids, settleable | daily maximum | report only (mL/L) | all year |
| Flow, in conduit or thru treatment plant | monthly average | ≤ .25 MGD | all year |
| Flow, in conduit or thru treatment plant | monthly average | ≤ .6 MGD | all year |
| Chlorine, total residual | daily maximum | ≤ .5 mg/L | May–Oct |
| Chlorine, total residual | daily maximum | ≤ 1 lb/d | May–Oct |
| Coliform, fecal general | 30-day geometric mean | ≤ 200 #/100mL | May–Oct |
| Coliform, fecal general | 7-day geometric mean | ≤ 400 #/100mL | May–Oct |
| BOD, 5-day, percent removal | monthly average minimum | ≥ 85 % | all year |
| BOD, 5-day, percent removal | monthly average minimum | ≥ 50 % | all year |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | all year |
| Solids, suspended percent removal | monthly average minimum | ≥ 50 % | all year |
Cited limits by parameter: New York's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/NY0031461 · MCP: https://passage-data.com/mcp