BRASHER (T)

NPDES permit NY0030732 · Minor POTW · effective, expires 2026-09-30 · EPA's file as of 2026-09-19

Check this month's numbers before you file
Watch this permit — $79 a month. Every Monday, from EPA's newest files: the next report due and when, whether EPA's file holds your last one, any change to this permit's limits or status, and the renewal date.

EPA's record, 2025-09-01 to 2026-08-31

5values over a limit
24required values missing, on 6 form(s)
2of 26 forms filed late

Last period with anything received: 2026-07-31. Most often over: Flow, in conduit or thru treatment plant (2), BOD, 5-day, 20 deg. C (2), BOD, 5-day, percent removal (1).

Reporting

Reports are due about 28 days after each monitoring period ends (read off this permit's own late-day counts in EPA's filings).

Limits in force (28)

OutfallParameterStatisticLimitMonths
001Temperature, water deg. fahrenheitDAILY MX report only all year
001Temperature, water deg. fahrenheitDAILY MX report only all year
001BOD, 5-day, 20 deg. C30DA AVG <= 30 mg/L all year
001BOD, 5-day, 20 deg. C7 DA AVG <= 45 mg/L all year
001BOD, 5-day, 20 deg. C30DA AVG <= 50 lb/d all year
001BOD, 5-day, 20 deg. C7 DA AVG <= 75 lb/d all year
001BOD, 5-day, 20 deg. C30DA AVG report only all year
001pHMINIMUM >= 6 SU all year
001pHMAXIMUM <= 9 SU all year
001pHMINIMUM report only all year
001pHMAXIMUM report only all year
001Solids, total suspended30DA AVG <= 40 mg/L all year
001Solids, total suspended7 DA AVG <= 60 mg/L all year
001Solids, total suspended30DA AVG <= 68 lb/d all year
001Solids, total suspended7 DA AVG <= 100 lb/d all year
001Solids, total suspended30DA AVG report only all year
001Solids, settleableDAILY MX <= .3 mL/L all year
001Solids, settleableDAILY MX report only all year
001Flow, in conduit or thru treatment plant30DA AVG <= .2 MGD all year
001Chlorine, total residualDAILY MX <= 2 mg/L May, Jun, Jul, Aug, Sep
001Coliform, fecal general30DA GM <= 200 MPN/100mL May, Jun, Jul, Aug, Sep
001Coliform, fecal general7 DA GEO <= 400 MPN/100mL May, Jun, Jul, Aug, Sep
001BOD, 5-day, percent removalMO AV MN >= 75 % all year
001Solids, suspended percent removalMO AV MN >= 75 % all year
003ConductivityDAILY MX report only all year
003pHMINIMUM report only all year
003pHMAXIMUM report only all year
003Alkalinity, total [as CaCO3]DAILY MX report only all year

Built from EPA's ECHO bulk files. EPA's file, not the permit document, is the source: read your permit. Check a report before you file it · All states