Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Trumansburg, New York. NPDES permit NY0024902, in force until Aug 31, 2029. Last 12 months: over a limit 5 times (last June 2026). Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| March 2026 | Flow, in conduit or thru treatment plant, monthly average | .303 MGD | ≤ .25 MGD | 21% |
| April 2026 | Flow, in conduit or thru treatment plant, monthly average | .346 MGD | ≤ .25 MGD | 38% |
| May 2026 | Phosphorus, total [as P], daily maximum | .57 mg/L | ≤ .5 mg/L | 14% |
| May 2026 | Phosphorus, total [as P], daily maximum | 1.15 lb/d | ≤ 1 lb/d | 15% |
| June 2026 | Phosphorus, total [as P], daily maximum | .62 mg/L | ≤ .5 mg/L | 24% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Temperature, water deg. centigrade | daily maximum | report only (deg C) | all year |
| Temperature, water deg. centigrade | daily maximum | report only (deg C) | all year |
| Oxygen, dissolved [DO] | daily minimum | ≥ 7 mg/L | Apr–Oct |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 10 mg/L | all year |
| BOD, 5-day, 20 deg. C | 7-day average | ≤ 15 mg/L | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 20.8 lb/d | all year |
| BOD, 5-day, 20 deg. C | 7-day average | ≤ 31.3 lb/d | all year |
| BOD, 5-day, 20 deg. C | monthly average | report only (mg/L) | all year |
| pH | minimum | ≥ 6.5 SU | all year |
| pH | maximum | ≤ 8.5 SU | all year |
| pH | minimum | report only (SU) | all year |
| pH | maximum | report only (SU) | all year |
| Solids, total suspended | monthly average | ≤ 10 mg/L | all year |
| Solids, total suspended | 7-day average | ≤ 15 mg/L | all year |
| Solids, total suspended | monthly average | ≤ 20.8 lb/d | all year |
| Solids, total suspended | 7-day average | ≤ 31.3 lb/d | all year |
| Solids, total suspended | monthly average | report only (mg/L) | all year |
| Solids, settleable | daily maximum | ≤ .1 mL/L | all year |
| Solids, settleable | daily maximum | report only (mL/L) | all year |
| Nitrogen, ammonia total [as N] | daily maximum | ≤ 1.2 mg/L | Apr–Oct |
| Nitrogen, ammonia total [as N] | daily maximum | ≤ 2.1 mg/L | Jan, Feb, Mar, Nov, Dec |
| Nitrogen, ammonia total [as N] | daily maximum | ≤ 2.5 lb/d | Apr–Oct |
| Nitrogen, ammonia total [as N] | daily maximum | ≤ 4.4 lb/d | Jan, Feb, Mar, Nov, Dec |
| Nitrogen, ammonia total [as N] | daily maximum | report only (mg/L) | all year |
| Nitrogen, ammonia total [as N] | daily maximum | report only (lb/d) | all year |
| Phosphorus, total [as P] | daily maximum | ≤ .5 mg/L | all year |
| Phosphorus, total [as P] | daily maximum | ≤ 1 lb/d | all year |
| Phosphorus, total [as P] | daily maximum | report only (mg/L) | all year |
| Phosphorus, total [as P] | daily maximum | report only (lb/d) | all year |
| Flow, in conduit or thru treatment plant | monthly average | ≤ .25 MGD | all year |
| Chlorine, total residual | daily maximum | ≤ .02 mg/L | all year |
| Coliform, fecal general | 30-day geometric mean | ≤ 200 #/100mL | all year |
| Coliform, fecal general | 7-day geometric mean | ≤ 400 #/100mL | all year |
| BOD, 5-day, percent removal | monthly average minimum | ≥ 85 % | all year |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | all year |
Cited limits by parameter: New York's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/NY0024902 · MCP: https://passage-data.com/mcp