Martinsburg (T)

Sewage treatment plant, Glenfield, New York. NPDES permit NY0020281, in force until Feb 28, 2027. Last 12 months: over a limit 4 times (last April 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A monthly (6 values), form Q quarterly (16 values)
Renewal application due
Sep 1, 2026 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
3 values over a limit, 0 required values missing, 0 of 16 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
March 2026BOD, 5-day, percent removal, monthly average minimum82 %≥ 85 %20%
March 2026Flow, in conduit or thru treatment plant, monthly average.091 MGD≤ .08 MGD14%
March 2026Solids, suspended percent removal, monthly average minimum74 %≥ 85 %73%
April 2026Flow, in conduit or thru treatment plant, monthly average.093 MGD≤ .08 MGD16%

Limits in force (27)

ParameterStatisticLimitMonths
Temperature, water deg. centigradedaily averagereport only (deg C)all year
Temperature, water deg. centigradedaily maximumreport only (deg C)all year
Temperature, water deg. centigradedaily maximumreport only (deg C)all year
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. C7-day average≤ 45 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 15 lb/dall year
BOD, 5-day, 20 deg. C7-day average≤ 23 lb/dall year
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
BOD, 5-day, 20 deg. Cmonthly averagereport only (lb/d)all year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspended7-day average≤ 45 mg/Lall year
Solids, total suspendedmonthly average≤ 15 lb/dall year
Solids, total suspended7-day average≤ 23 lb/dall year
Solids, total suspendedmonthly averagereport only (mg/L)all year
Solids, total suspendedmonthly averagereport only (mg/L)all year
Solids, total suspendedmonthly averagereport only (lb/d)all year
Solids, settleabledaily maximum≤ .1 mL/Lall year
Flow, in conduit or thru treatment plantmonthly average≤ .06 MGDall year
Flow, in conduit or thru treatment plantmonthly average≤ .08 MGDall year
Chlorine, total residualdaily maximum≤ 2 mg/LMay–Oct
Coliform, fecal general30-day geometric mean≤ 200 #/100mLMay–Oct
Coliform, fecal general7-day geometric mean≤ 400 #/100mLMay–Oct
BOD, 5-day, percent removalmonthly average minimum≥ 85 %all year
Solids, suspended percent removalmonthly average minimum≥ 85 %all year

How strict are these limits?

Cited limits by parameter: New York's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history