Passage Data · Check a report · Use it from your AI

Cupertino Electric, Inc

Heavy Construction, Las Vegas, Nevada. NPDES permit NV0024260, in force until Feb 28, 2029. Last 12 months: no values over a limit, 80 required values missing, 33 of 54 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: outfall 001 form A monthly (3 values), outfall 002 form A monthly (3 values), outfall 003 form A monthly (3 values), outfall 004 form A monthly (3 values), outfall 005 form Q monthly (2 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 156 required values missing, 55 of 60 reports late

Limits in force (27)

ParameterStatisticLimitMonthsOutfall
Turbiditydaily maximum≤ 50 NTUall year001
Turbiditydaily maximum≤ 50 NTUall year001
Hydrocarbons, total petroleumdaily maximum≤ 1 mg/Lall year001
Hydrocarbons, total petroleumdaily maximum≤ 1 mg/Lall year001
Area inspection visualvaluereport only (pass=0;fail=1)all year001
Area inspection visualvaluereport only (pass=0;fail=1)all year001
Turbiditydaily maximum≤ 50 NTUall year002
Turbiditydaily maximum≤ 50 NTUall year002
Hydrocarbons, total petroleumdaily maximum≤ 1 mg/Lall year002
Hydrocarbons, total petroleumdaily maximum≤ 1 mg/Lall year002
Area inspection visualvaluereport only (pass=0;fail=1)all year002
Area inspection visualvaluereport only (pass=0;fail=1)all year002
Turbiditydaily maximum≤ 50 NTUall year003
Turbiditydaily maximum≤ 50 NTUall year003
Hydrocarbons, total petroleumdaily maximum≤ 1 mg/Lall year003
Hydrocarbons, total petroleumdaily maximum≤ 1 mg/Lall year003
Area inspection visualvaluereport only (pass=0;fail=1)all year003
Turbiditydaily maximum≤ 50 NTUall year004
Turbiditydaily maximum≤ 50 NTUall year004
Hydrocarbons, total petroleumdaily maximum≤ 1 mg/Lall year004
Hydrocarbons, total petroleumdaily maximum≤ 1 mg/Lall year004
Area inspection visualvaluereport only (pass=0;fail=1)all year004
Area inspection visualvaluereport only (pass=0;fail=1)all year004
Flow rate30-day average≤ .4 MGDall year005
Flow rate30-day average≤ .4 MGDall year005
Flow ratedaily maximum≤ .5 MGDall year005
Flow ratedaily maximum≤ .5 MGDall year005

How strict are these limits?

Cited limits by parameter: Nevada's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NV0024260 · MCP: https://passage-data.com/mcp