Passage Data · Check a report · Use it from your AI

Buckman Direct Diversion Proje

Water Supply, major discharger, Santa Fe, New Mexico. NPDES permit NM0030848, in force until Apr 30, 2030. Last 12 months: over a limit once (last March 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 61 days after each period: outfall 001 form A monthly (9 values), outfall TX1 form S twice a year, outfall TX1 form Y yearly
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 15 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimit
March 2026Turbidity, Test Failures, daily maximum1 # exceed≤ 0 # exceed

Limits in force (15)

ParameterStatisticLimitMonthsOutfall
Stream flow, instantaneous30-day averagereport only (cfs)all year001
Stream flow, instantaneousdaily maximumreport only (cfs)all year001
pHminimum≥ 6.6 SUall year001
pHmaximum≤ 9 SUall year001
Flow, in conduit or thru treatment plant30-day averagereport only (MGD)all year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
Turbidity, Test Failuresdaily maximum≤ 0 # exceedall year001
Turbidity, backgrounddaily maximumreport only (NTU)all year001
Turbidity, increase over backgrounddaily maximumreport only (NTU)all year001
Low Flow Pass/Fail Static Renewal 48Hr Acute Daphnia pulexvaluereport only (pass=0;fail=1)all yearTX1
LF Pass/Fail Static Renewal 48Hr Acute Pimephales promelasvaluereport only (pass=0;fail=1)all yearTX1
NOAEC Lethal Statis Renewal 48 Hr Acute Daphnia pulexvaluereport only (%)all yearTX1
NOAEC Lethal Static Renewal 48Hr acute Pimephales promelasvaluereport only (%)all yearTX1
Coef Of Var Static Renewal 48Hr Acute D. pulexvaluereport only (%)all yearTX1
Coef Of Var Static Renewal 48Hr Acute Pimephales promelasvaluereport only (%)all yearTX1

How strict are these limits?

Cited limits by parameter: New Mexico's rules and the federal ones.

Same industry: the 6 Water Supply permits in New Mexico.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NM0030848 · MCP: https://passage-data.com/mcp