Passage Data · Check a report · Use it from your AI

Camden County

Water Supply, Camden, North Carolina. NPDES permit NC0086681, in force until Apr 30, 2029. Last 12 months: no values over a limit, 4 of 48 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 30 days after each period: outfall 001 form M monthly (12 values), outfall 001A form M monthly (3 values), outfall 001B form M monthly (3 values), outfall 001D form M monthly (3 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 4 required values missing, 0 of 48 reports late

Limits in force (21)

ParameterStatisticLimitMonthsOutfall
Turbiditydaily maximumreport only (NTU)all year001
Conductivitydaily maximumreport only (umho/cm)all year001
pHdaily minimum≥ 6.8 SUall year001
pHdaily maximum≤ 8.5 SUall year001
Salinitydaily maximumreport only (ppk)all year001
Nitrogen, ammonia total [as N]daily maximumreport only (mg/L)all year001
Copper, total [as Cu]daily maximumreport only (ug/L)all year001
Zinc, total [as Zn]daily maximumreport only (ug/L)all year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
Chlorine, total residualdaily maximum≤ 13 ug/Lall year001
Solids, total dissolveddaily maximumreport only (mg/L)all year001
Duration of dischargedaily maximumreport only (hr)all year001
Conductivitydaily maximumreport only (umho/cm)all year001A
pHdaily maximumreport only (SU)all year001A
Salinitydaily maximumreport only (ppk)all year001A
Conductivitydaily maximumreport only (umho/cm)all year001B
pHdaily maximumreport only (SU)all year001B
Salinitydaily maximumreport only (ppk)all year001B
Conductivitydaily maximumreport only (umho/cm)all year001D
pHdaily maximumreport only (SU)all year001D
Salinitydaily maximumreport only (ppk)all year001D

How strict are these limits?

Cited limits by parameter: North Carolina's rules and the federal ones.

Same industry: the 130 Water Supply permits in North Carolina.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NC0086681 · MCP: https://passage-data.com/mcp