Passage Data · Check a report · Use it from your AI

Village of Bald Head Island

Water Supply, Bald Head Island, North Carolina. NPDES permit NC0085553, in force until Nov 30, 2027. Last 12 months: no values over a limit, 42 required values missing, 7 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 31 days after each period: form M monthly (21 values)
Renewal application due
Jun 3, 2027 · 180 days before expiry; your permit may set another date
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 22 required values missing, 7 of 12 reports late

Limits in force (21)

ParameterStatisticLimitMonths
Temperature, water deg. centigradedaily maximumreport only (deg C)all year
Temperature, water deg. centigradedaily maximumreport only (deg C)all year
Temperature, water deg. centigradedaily maximumreport only (deg C)all year
Conductivitydaily maximumreport only (umho/cm)all year
Conductivitydaily maximumreport only (umho/cm)all year
Conductivitydaily maximumreport only (umho/cm)all year
Oxygen, dissolved [DO]daily maximumreport only (mg/L)all year
Oxygen, dissolved [DO]daily maximumreport only (mg/L)all year
Oxygen, dissolved [DO]daily maximumreport only (mg/L)all year
pHdaily minimum≥ 6.8 SUall year
pHdaily maximum≤ 8.5 SUall year
pHdaily maximumreport only (SU)all year
pHdaily maximumreport only (SU)all year
Salinitydaily maximumreport only (ppt)all year
Salinitydaily maximumreport only (ppt)all year
Salinitydaily maximumreport only (ppt)all year
Nitrogen, ammonia total [as N]daily maximumreport only (mg/L)all year
Chloride [as Cl]daily maximumreport only (mg/L)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualdaily maximum≤ 13 ug/Lall year
Solids, total dissolveddaily maximumreport only (mg/L)all year

How strict are these limits?

Cited limits by parameter: North Carolina's rules and the federal ones.

Same industry: the 130 Water Supply permits in North Carolina.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NC0085553 · MCP: https://passage-data.com/mcp