Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Ansonville, North Carolina. NPDES permit NC0081825, in force until Jan 31, 2028. Last 12 months: over a limit 6 times (last March 2026), 13 required values missing, 3 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| December 2025 | Coliform, fecal MF, MFC broth, 44.5 C, weekly geometric mean | 600 #/100mL | ≤ 400 #/100mL | 50% |
| December 2025 | Solids, total suspended, 30-day average | 47.3 mg/L | ≤ 30 mg/L | 58% |
| December 2025 | Solids, total suspended, 7-day average | 158 mg/L | ≤ 45 mg/L | 251% |
| February 2026 | Coliform, fecal MF, MFC broth, 44.5 C, weekly geometric mean | 1650 #/100mL | ≤ 400 #/100mL | 313% |
| February 2026 | Solids, total suspended, 7-day average | 60 mg/L | ≤ 45 mg/L | 33% |
| March 2026 | Coliform, fecal MF, MFC broth, 44.5 C, weekly geometric mean | 1130 #/100mL | ≤ 400 #/100mL | 183% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Temperature, water deg. centigrade | daily maximum | report only (deg C) | all year |
| BOD, 5-day, 20 deg. C | 7-day average | ≤ 45 mg/L | all year |
| BOD, 5-day, 20 deg. C | 30-day average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | daily maximum | report only (mg/L) | all year |
| pH | daily minimum | ≥ 6 SU | all year |
| pH | daily maximum | ≤ 9 SU | all year |
| Solids, total suspended | 7-day average | ≤ 45 mg/L | all year |
| Solids, total suspended | 30-day average | ≤ 30 mg/L | all year |
| Solids, total suspended | daily maximum | report only (mg/L) | all year |
| Coliform, fecal MF, MFC broth, 44.5 C | weekly geometric mean | ≤ 400 #/100mL | all year |
| Coliform, fecal MF, MFC broth, 44.5 C | monthly geometric mean | ≤ 200 #/100mL | all year |
| Flow, in conduit or thru treatment plant | 30-day average | ≤ .12 MGD | all year |
| Chlorine, total residual | daily maximum | ≤ 28 ug/L | all year |
Cited limits by parameter: North Carolina's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/NC0081825 · MCP: https://passage-data.com/mcp