Passage Data · Check a report · Use it from your AI

Mvp Group International

Manufacturing Industries, Elkin, North Carolina. NPDES permit NC0060691 expired Dec 31, 2023; its limits still apply. Last 12 months: over a limit 3 times (last July 2026), 1 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 33 days after each period: form M monthly (10 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
2 values over a limit, 0 required values missing, 0 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
November 2025BOD, 5-day, 20 deg. C, 30-day average64.55 mg/L≤ 30 mg/L115%
November 2025BOD, 5-day, 20 deg. C, daily maximum140 mg/L≤ 45 mg/L211%
July 2026BOD, 5-day, 20 deg. C, daily maximum105 mg/L≤ 45 mg/L133%

Limits in force (10)

ParameterStatisticLimitMonths
Temperature, water deg. centigradedaily maximumreport only (deg C)all year
BOD, 5-day, 20 deg. C30-day average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 45 mg/Lall year
pHdaily minimum≥ 6 SUall year
pHdaily maximum≤ 9 SUall year
Solids, total suspended30-day average≤ 30 mg/Lall year
Solids, total suspendeddaily maximum≤ 45 mg/Lall year
Nitrogen, ammonia total [as N]daily maximumreport only (mg/L)all year
Flow, in conduit or thru treatment plant30-day average≤ .02 MGDall year
Chlorine, total residualdaily maximum≤ 28 ug/Lall year

Cited limits by parameter: North Carolina's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NC0060691 · MCP: https://passage-data.com/mcp