Passage Data · Check a report · Use it from your AI

Tryon Finishing Corporation

Finishing Plants, Tryon, North Carolina. NPDES permit NC0048305, in force until Jan 31, 2031. Last 12 months: no values over a limit, 2 of 22 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 31 days after each period: outfall 001 form M monthly (9 values), outfall 002 form M monthly (9 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 24 reports late

Limits in force (18)

ParameterStatisticLimitMonthsOutfall
Turbiditydaily maximum≤ 50 NTUall year001
pHdaily minimum≥ 6 SUall year001
pHdaily maximum≤ 9 SUall year001
Solids, total suspended30-day average≤ 30 mg/Lall year001
Solids, total suspendeddaily maximum≤ 45 mg/Lall year001
Solids, settleable30-day average≤ .1 mL/Lall year001
Solids, settleabledaily maximum≤ .2 mL/Lall year001
Aluminum, total [as Al]daily maximumreport only (mg/L)all year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
Turbiditydaily maximum≤ 50 NTUall year002
pHdaily minimum≥ 6 SUall year002
pHdaily maximum≤ 9 SUall year002
Solids, total suspended30-day average≤ 30 mg/Lall year002
Solids, total suspendeddaily maximum≤ 45 mg/Lall year002
Solids, settleable30-day average≤ .1 mL/Lall year002
Solids, settleabledaily maximum≤ .2 mL/Lall year002
Aluminum, total [as Al]daily maximumreport only (mg/L)all year002
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year002

How strict are these limits?

Cited limits by parameter: North Carolina's rules and the federal ones.

Same industry: the 14 Textile Mill Products permits in North Carolina.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NC0048305 · MCP: https://passage-data.com/mcp