Passage Data · Check a report · Use it from your AI

Arclin USA Inc

Plastics Materials And Resins, major discharger, Moncure, North Carolina. NPDES permit NC0000892, in force until Apr 30, 2028. Last 12 months: over a limit 4 times (last February 2026), 4 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 31 days after each period: form M monthly (14 values)
Renewal application due
Nov 2, 2027 · 180 days before expiry; your permit may set another date
Last report on file
August 2026
Oct 2024 – Sep 2025
1 value over a limit, 15 required values missing, 10 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
January 2026BOD, 5-day, 20 deg. C, 30-day average47.125 lb/d≤ 36.1 lb/d31%
January 2026BOD, 5-day, 20 deg. C, daily maximum153.5 lb/d≤ 95.95 lb/d60%
February 2026BOD, 5-day, 20 deg. C, 30-day average72.525 lb/d≤ 36.1 lb/d101%
February 2026BOD, 5-day, 20 deg. C, daily maximum168.5 lb/d≤ 95.95 lb/d76%

Limits in force (14)

ParameterStatisticLimitMonths
Conductivitydaily maximumreport only (umho/cm)all year
Oxygen, dissolved [DO]daily maximumreport only (mg/L)all year
BOD, 5-day, 20 deg. C30-day average≤ 36.1 lb/dall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 95.95 lb/dall year
pHdaily minimum≥ 6 SUall year
pHdaily maximum≤ 9 SUall year
Solids, total suspended30-day average≤ 39.6 lb/dall year
Solids, total suspendeddaily maximum≤ 126.85 lb/dall year
Nitrogen, ammonia total [as N]daily maximumreport only (mg/L)all year
Nitrogen, Kjeldahl, total [as N]daily maximumreport only (mg/L)all year
Nitrite + Nitrate total [as N]daily maximumreport only (mg/L)all year
Coliform, fecal MF, MFC broth, 44.5 Cdaily maximumreport only (#/100mL)all year
Flow, in conduit or thru treatment plant30-day average≤ .1 MGDall year
Formaldehydedaily maximumreport only (mg/L)all year

Cited limits by parameter: North Carolina's rules and the federal ones.

Same industry: the 17 Chemicals and Allied Products permits in North Carolina.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NC0000892 · MCP: https://passage-data.com/mcp