Passage Data · Check a report · Use it from your AI

Hood Industries Inc, Waynesboro

Sawmills And Planing Mills, General, Waynesboro, Mississippi. NPDES permit MSP092487, in force until Jun 30, 2031. Last 12 months: no values over a limit, 12 required values missing, 1 of 3 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A monthly (12 values)
Last report on file
September 2026

Limits in force (12)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheitmonthly averagereport only (deg F)all year
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)all year
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
BOD, 5-day, 20 deg. Cdaily maximumreport only (mg/L)all year
pHminimum≥ 6 SUall year
pHmaximum≤ 8.5 SUall year
Solids, total suspendedmonthly averagereport only (mg/L)all year
Solids, total suspendeddaily maximumreport only (mg/L)all year
Copper, total recoverablemonthly average≤ .025 mg/Lall year
Copper, total recoverabledaily maximum≤ .0375 mg/Lall year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximum≤ .032 MGDall year

How strict are these limits?

Cited limits by parameter: Mississippi's rules and the federal ones.

Same industry: the 23 Lumber and Wood Products permits in Mississippi.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MSP092487 · MCP: https://passage-data.com/mcp