Passage Data · Check a report · Use it from your AI

Entergy Mississippi LLC Delta Blues Advanced Power Station

Electric Services, Greenville, Mississippi. NPDES permit MSP092478, in force until May 31, 2030. Last 12 months: no values over a limit, 1 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A monthly (5 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 20 required values missing, 4 of 4 reports late

Limits in force (5)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)all year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year

Cited limits by parameter: Mississippi's rules and the federal ones.

Same industry: the 20 Electric Services permits in Mississippi.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MSP092478 · MCP: https://passage-data.com/mcp