Passage Data · Check a report · Use it from your AI
Electric Services, Greenville, Mississippi. NPDES permit MSP092478, in force until May 31, 2030. Last 12 months: no values over a limit, 1 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Temperature, water deg. fahrenheit | daily maximum | report only (deg F) | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Flow, in conduit or thru treatment plant | monthly average | report only (MGD) | all year |
| Flow, in conduit or thru treatment plant | daily maximum | report only (MGD) | all year |
Cited limits by parameter: Mississippi's rules and the federal ones.
Same industry: the 20 Electric Services permits in Mississippi.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/MSP092478 · MCP: https://passage-data.com/mcp