NPDES permit MSP092449 · Minor NON-POTW · effective, expires 2031-05-31 · EPA's file as of 2026-09-19
Check this month's numbers before you fileLast period with anything received: 2026-08-31. Most often over: pH (1).
Reports are due about 28 days after each monitoring period ends (the most common figure among MS permits in EPA's filings — check your permit).
| Outfall | Parameter | Statistic | Limit | Months |
|---|---|---|---|---|
| 001 | pH | MINIMUM | >= 6 SU | all year |
| 001 | pH | MAXIMUM | <= 9.5 SU | all year |
| 001 | Flow, in conduit or thru treatment plant | MO AVG | <= .00864 MGD | all year |
| 001 | Flow, in conduit or thru treatment plant | DAILY MX | report only | all year |
Built from EPA's ECHO bulk files. EPA's file, not the permit document, is the source: read your permit. Check a report before you file it · All states