Passage Data · Check a report · Use it from your AI

South Haven Partnership LP, South Haven Townhouses

Apartment Building Operators, Vicksburg, Mississippi. NPDES permit MS0034576, in force until Feb 28, 2029. Last 12 months: over a limit once (last December 2025), 1 of 1 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form Y yearly
Last report on file
December 2025
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 1 of 1 report late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimit
December 2025pH, maximum729 SU≤ 9 SU

Limits in force (16)

ParameterStatisticLimitMonths
BOD, 5-day, 20 deg. Cmaximum monthly average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 45 mg/Lall year
BOD, 5-day, 20 deg. Cmaximum monthly average≤ 5.3 lb/dall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 7.9 lb/dall year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
Solids, total suspendedmaximum monthly average≤ 60 mg/Lall year
Solids, total suspendeddaily maximum≤ 60 mg/Lall year
Solids, total suspendedmaximum monthly average≤ 10.5 lb/dall year
Solids, total suspendeddaily maximum≤ 10.5 lb/dall year
Flow, in conduit or thru treatment plantmaximum monthly average≤ .021 MGDall year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualminimum≥ .1 mg/Lall year
Chlorine, total residualmaximum≤ 1 mg/Lall year
E. colimaximum monthly average≤ 126 #/100mLall year
E. colidaily maximum≤ 410 #/100mLall year

How strict are these limits?

Cited limits by parameter: Mississippi's rules and the federal ones.

Same industry: the 245 Real Estate permits in Mississippi.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MS0034576 · MCP: https://passage-data.com/mcp