Spire Missouri Inc.

Natural Gas Distribution, St. Louis, Missouri. NPDES permit MO0114804 expired Jun 30, 2025; its limits still apply. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: outfall 004 form M monthly (12 values), outfall MW1 form B twice a year, outfall MW2 form B twice a year, outfall MW3 form B twice a year, outfall MW4 form B twice a year, outfall MW5 form B twice a year, and 2 more forms
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 24 reports late

Limits in force (40)

ParameterStatisticLimitMonthsOutfall
pHminimum≥ 6 SUall year004
pHmaximum≤ 9 SUall year004
Nitrogen, nitrate total [as N]daily maximumreport only (mg/L)all year004
Nitrogen, nitrate total [as N]monthly averagereport only (mg/L)all year004
Benzenedaily maximumreport only (ug/L)all year004
Benzenemonthly average≤ 5 ug/Lall year004
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year004
Flow, in conduit or thru treatment plantvaluereport only (MGD)all year004
Butanedaily maximumreport only (ug/L)all year004
Butanemonthly averagereport only (ug/L)all year004
Proprane, totaldaily maximumreport only (ug/L)all year004
Proprane, totalmonthly averagereport only (ug/L)all year004
Benzenedaily maximumreport only (ug/L)all yearMW1
Depth to water level ft below landsurfacevaluereport only (ft)all yearMW1
Butanedaily maximumreport only (ug/L)all yearMW1
Proprane, totaldaily maximumreport only (ug/L)all yearMW1
Benzenedaily maximumreport only (ug/L)all yearMW2
Depth to water level ft below landsurfacevaluereport only (ft)all yearMW2
Butanedaily maximumreport only (ug/L)all yearMW2
Proprane, totaldaily maximumreport only (ug/L)all yearMW2
Benzenedaily maximumreport only (ug/L)all yearMW3
Depth to water level ft below landsurfacevaluereport only (ft)all yearMW3
Butanedaily maximumreport only (ug/L)all yearMW3
Proprane, totaldaily maximumreport only (ug/L)all yearMW3
Benzenedaily maximumreport only (ug/L)all yearMW4
Depth to water level ft below landsurfacevaluereport only (ft)all yearMW4
Butanedaily maximumreport only (ug/L)all yearMW4
Proprane, totaldaily maximumreport only (ug/L)all yearMW4
Benzenedaily maximumreport only (ug/L)all yearMW5
Depth to water level ft below landsurfacevaluereport only (ft)all yearMW5
Butanedaily maximumreport only (ug/L)all yearMW5
Proprane, totaldaily maximumreport only (ug/L)all yearMW5
Benzenedaily maximumreport only (ug/L)all yearMW6
Depth to water level ft below landsurfacevaluereport only (ft)all yearMW6
Butanedaily maximumreport only (ug/L)all yearMW6
Proprane, totaldaily maximumreport only (ug/L)all yearMW6
Benzenedaily maximumreport only (ug/L)all yearMW7
Depth to water level ft below landsurfacevaluereport only (ft)all yearMW7
Butanedaily maximumreport only (ug/L)all yearMW7
Proprane, totaldaily maximumreport only (ug/L)all yearMW7

How strict are these limits?

Cited limits by parameter: Missouri's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MO0114804 · MCP: https://passage-data.com/mcp