Passage Data · Check a report · Use it from your AI

Southern Star Central Gas Pipeline, Inc

Natural Gas Transmission, Joplin, Missouri. NPDES permit MO0108766, in force until Dec 31, 2030. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: outfall 001 form Q quarterly (5 values), outfall 002 form M monthly (2 values), outfall 002 form A yearly
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 16 reports late

Limits in force (8)

ParameterStatisticLimitMonthsOutfall
pHminimumreport only (SU)all year001
pHmaximumreport only (SU)all year001
Oil and grease [soxhlet extr.] tot.daily maximumreport only (mg/L)all year001
Iron, total recoverabledaily maximumreport only (ug/L)all year001
Benzenedaily maximumreport only (ug/L)all year001
Benzenedaily maximum≤ .056 mg/kgall year002
Application rate area sprayeddaily maximumreport only (acr)all year002
Application rate, gallons spray irrigationdaily maximumreport only (gal)all year002

Cited limits by parameter: Missouri's rules and the federal ones.

Same industry: the 6 Natural Gas Transmission permits in Missouri.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MO0108766 · MCP: https://passage-data.com/mcp