Passage Data · Check a report · Use it from your AI

ANR Pipeline Company

Natural Gas Transmission, Graham, Missouri. NPDES permit MO0106241 expired Jun 30, 2025; its limits still apply. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form Q quarterly (14 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
1 value over a limit, 0 required values missing, 0 of 4 reports late

Limits in force (14)

ParameterStatisticLimitMonths
Specific conductancedaily maximumreport only (uS/cm)all year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
Solids, total suspendeddaily maximumreport only (mg/L)all year
Solids, settleabledaily maximumreport only (mL/L)all year
Oil and grease [soxhlet extr.] tot.daily maximumreport only (mg/L)all year
Oil petroleum, total recoverabledaily maximum≤ 10 mg/Lall year
Oil petroleum, total recoverablemonthly average≤ 10 mg/Lall year
Rainfalldaily maximumreport only (in)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Total Petroleum Hydrocarbons - Dieseldaily maximum≤ 10 mg/Lall year
Total Petroleum Hydrocarbons - Dieselmonthly average≤ 10 mg/Lall year
Total Petroleum Hydrocarbons - Gasolinedaily maximum≤ 10 mg/Lall year
Total Petroleum Hydrocarbons - Gasolinemonthly average≤ 10 mg/Lall year

Cited limits by parameter: Missouri's rules and the federal ones.

Same industry: the 6 Natural Gas Transmission permits in Missouri.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MO0106241 · MCP: https://passage-data.com/mcp