Passage Data · Check a report · Use it from your AI

Glyn Ferrell

Sewerage Systems, Benton, Missouri. NPDES permit MO0081957 expired Sep 30, 2026; its limits still apply. Last 12 months: over a limit 2 times (last September 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form Q quarterly (16 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
1 value over a limit, 0 required values missing, 0 of 4 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimit
June 2026pH, maximum9.36≤ 9 SU
September 2026pH, maximum9.15≤ 9 SU

Limits in force (22)

ParameterStatisticLimitMonths
Oxygen, dissolved [DO]daily minimumreport only (mg/L)Apr–Dec
Oxygen, dissolved [DO]monthly average minimumreport only (mg/L)Apr–Dec
BOD, 5-day, 20 deg. Cweekly average≤ 65 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 45 mg/Lall year
pHminimum≥ 6.5 SUall year
pHmaximum≤ 9 SUall year
Solids, total suspendedweekly average≤ 110 mg/Lall year
Solids, total suspendedmonthly average≤ 70 mg/Lall year
Nitrogen, ammonia total [as N]daily maximum≤ 17 mg/LApr–Jun
Nitrogen, ammonia total [as N]daily maximum≤ 14.4 mg/LJul–Sep
Nitrogen, ammonia total [as N]daily maximum≤ 14.4 mg/LOct–Dec
Nitrogen, ammonia total [as N]daily maximum≤ 17 mg/LJan–Mar
Nitrogen, ammonia total [as N]monthly average≤ 2.2 mg/LApr–Jun
Nitrogen, ammonia total [as N]monthly average≤ 1.4 mg/LJul–Sep
Nitrogen, ammonia total [as N]monthly average≤ 3.4 mg/LOct–Dec
Nitrogen, ammonia total [as N]monthly average≤ 3.9 mg/LJan–Mar
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Chlorine, total residualdaily maximum≤ 18 ug/LApr–Dec
Chlorine, total residualmonthly average≤ 9 ug/LApr–Dec
E. colidaily maximum≤ 1030 #/100mLApr–Dec
E. coli30-day geometric mean≤ 206 #/100mLApr–Dec

How strict are these limits?

Cited limits by parameter: Missouri's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MO0081957 · MCP: https://passage-data.com/mcp