Passage Data · Check a report · Use it from your AI

ME Global

Steel Foundries, Duluth, Minnesota. NPDES permit MN0053830 expired Aug 31, 2021; its limits still apply. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 47 days after each period: outfall D002 form A1 quarterly (11 values), outfall D003 form A1 yearly, outfall D004 form A1 yearly
Last report on file
June 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 6 reports late

Limits in force (21)

ParameterStatisticLimitMonthsOutfall
Temperature, water deg. fahrenheitquarterly maximum≤ 90 deg Fall yearD002
pHquarterly minimum≥ 6 SUall yearD002
pHquarterly maximum≤ 9 SUall yearD002
Nitrogen, total [as N]quarterly maximumreport only (mg/L)all yearD002
Nitrogen, Kjeldahl, total [as N]quarterly maximumreport only (mg/L)all yearD002
Nitrite + Nitrate total [as N]quarterly maximumreport only (mg/L)all yearD002
Phosphorus, total [as P]quarterly maximumreport only (mg/L)all yearD002
Sulfate, total [as SO4]quarterly maximumreport only (mg/L)all yearD002
Flow, in conduit or thru treatment plantquarterly averagereport only (MGD)all yearD002
Flow, in conduit or thru treatment plantquarterly totalreport only (Mgal/mo)all yearD002
Chlorine, total residualquarterly maximum≤ .04 mg/Lall yearD002
Solids, total suspendedannual averagereport only (mg/L)all yearD003
Copper, total [as Cu]annual averagereport only (mg/L)all yearD003
Iron, total [as Fe]annual averagereport only (mg/L)all yearD003
Zinc, total [as Zn]annual averagereport only (mg/L)all yearD003
Aluminum, total [as Al]annual averagereport only (mg/L)all yearD003
Solids, total suspendedannual averagereport only (mg/L)all yearD004
Copper, total [as Cu]annual averagereport only (mg/L)all yearD004
Iron, total [as Fe]annual averagereport only (mg/L)all yearD004
Zinc, total [as Zn]annual averagereport only (mg/L)all yearD004
Aluminum, total [as Al]annual averagereport only (mg/L)all yearD004

Cited limits by parameter: Minnesota's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MN0053830 · MCP: https://passage-data.com/mcp