Passage Data · Check a report · Use it from your AI
Pottery Products, Edgecomb, Maine. NPDES permit MEU508274, in force until Dec 31, 2026. Last 12 months: over a limit 2 times (last March 2026), 3 required values missing. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| January 2026 | Flow, in conduit or thru treatment plant, daily maximum | 676 gal/d | ≤ 300 gal/d | 125% |
| March 2026 | Flow, in conduit or thru treatment plant, daily maximum | 1645 gal/d | ≤ 300 gal/d | 448% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Solids, total suspended | daily maximum | report only (mg/L) | all year |
| Arsenic, total [as As] | daily maximum | report only (ug/L) | all year |
| Chromium, total [as Cr] | daily maximum | report only (ug/L) | all year |
| Copper, total [as Cu] | daily maximum | report only (ug/L) | all year |
| Lead, total [as Pb] | daily maximum | report only (ug/L) | all year |
| Nickel, total [as Ni] | daily maximum | report only (ug/L) | all year |
| Zinc, total [as Zn] | daily maximum | report only (ug/L) | all year |
| Flow, in conduit or thru treatment plant | daily maximum | ≤ 100 gal/d | all year |
| Flow, in conduit or thru treatment plant | daily maximum | ≤ 300 gal/d | all year |
Cited limits by parameter: Maine's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/MEU508274 · MCP: https://passage-data.com/mcp