Passage Data · Check a report · Use it from your AI
Industrial or other facility, Standish, Maine. NPDES permit MEU508270 expired Mar 31, 2024; its limits still apply. No reports in EPA's file for the last 12 months. Source: EPA ECHO, Oct 22, 2026.
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Temperature, water deg. fahrenheit | daily maximum | report only (deg F) | Mar, Jun, Sep, Dec |
| Conductivity | daily maximum | report only (umho/cm) | Mar, Jun, Sep, Dec |
Cited limits by parameter: Maine's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/MEU508270 · MCP: https://passage-data.com/mcp