Passage Data · Check a report · Use it from your AI

Houlton Water Company

Sewerage Systems, Houlton, Maine. NPDES permit MEU508219, in force until Aug 31, 2028. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: outfall 001 form A monthly (4 values), outfall SF1 form A monthly (2 values)
Renewal application due
Mar 4, 2028 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 20 reports late

Limits in force (20)

ParameterStatisticLimitMonthsOutfall
BOD, 5-day, 20 deg. Cdaily maximumreport only (mg/L)May–Nov001
pHdaily maximumreport only (SU)May–Nov001
Solids, total suspendeddaily maximumreport only (mg/L)May–Nov001
Nitrogen, nitrate total [as N]daily maximumreport only (mg/L)May–Nov001
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)May, OctMW2
Specific conductancedaily maximumreport only (umho/cm)May, OctMW2
pHdaily maximumreport only (SU)May, OctMW2
Solids, total suspendeddaily maximumreport only (mg/L)May, OctMW2
Nitrogen, nitrate total [as N]daily maximum≤ 10 mg/LMay, OctMW2
Chloride [as Cl]daily maximumreport only (mg/L)May, OctMW2
Depth to water level ft below landsurfacedaily maximumreport only (ft)May, Aug, OctMW2
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)May, OctMW3
Specific conductancedaily maximumreport only (umho/cm)May, OctMW3
pHdaily maximumreport only (SU)May, OctMW3
Solids, total suspendeddaily maximumreport only (mg/L)May, OctMW3
Nitrogen, nitrate total [as N]daily maximum≤ 10 mg/LMay, OctMW3
Chloride [as Cl]daily maximumreport only (mg/L)May, OctMW3
Depth to water level ft below landsurfacedaily maximumreport only (ft)May, Aug, OctMW3
Application rate, weekly spray irrigation.weekly maximum≤ 62500 gal/acrMay–NovSF1
Flow, totalmonthly totalreport only (gal/mo)May–NovSF1

Cited limits by parameter: Maine's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MEU508219 · MCP: https://passage-data.com/mcp