Passage Data · Check a report · Use it from your AI

Merrill Blueberry Farms, Inc.

Frozen Fruits And Vegetables, Hancock, Maine. NPDES permit MEU507792, in force until Dec 31, 2027. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: form 1 monthly (2 values)
Renewal application due
Jul 4, 2027 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 1 required value missing, 1 of 18 reports late

Limits in force (21)

ParameterStatisticLimitMonthsOutfall
BOD, 5-day, 20 deg. Cdaily maximumreport only (mg/L)Apr, May, Aug, Oct001
pHdaily maximumreport only (SU)Apr, May, Aug, Oct001
Nitrogen, nitrate total [as N]daily maximumreport only (mg/L)Apr, May, Aug, Oct001
Lagoon freeboardmonthly minimumreport only (ft)Apr, May, Aug, Oct001
Flow, totalmonthly totalreport only (gal/mo)Apr–NovFLD
Flow, totalweekly average≤ 746691 gal/wkApr–NovFLD
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)May, OctGW1
Specific conductancedaily maximumreport only (umho/cm)May, OctGW1
pHdaily maximumreport only (SU)May, OctGW1
Solids, total suspendeddaily maximumreport only (mg/L)May, OctGW1
Nitrogen, nitrate total [as N]daily maximum≤ 10 mg/LMay, OctGW1
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)May, OctGW3
Specific conductancedaily maximumreport only (umho/cm)May, OctGW3
pHdaily maximumreport only (SU)May, OctGW3
Solids, total suspendeddaily maximumreport only (mg/L)May, OctGW3
Nitrogen, nitrate total [as N]daily maximum≤ 10 mg/LMay, OctGW3
Temperature, water deg. fahrenheitdaily maximumreport only (deg F)May, OctGW4
Specific conductancedaily maximumreport only (umho/cm)May, OctGW4
pHdaily maximumreport only (SU)May, OctGW4
Solids, total suspendeddaily maximumreport only (mg/L)May, OctGW4
Nitrogen, nitrate total [as N]daily maximum≤ 10 mg/LMay, OctGW4

Cited limits by parameter: Maine's rules and the federal ones.

Same industry: the 18 Food and Kindred Products permits in Maine.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MEU507792 · MCP: https://passage-data.com/mcp