Passage Data · Check a report · Use it from your AI

The Downeast Salmon Federation Incorporated

Industrial or other facility, East Machias, Maine. NPDES permit ME0110523 expired Nov 30, 2024; its limits still apply. Last 12 months: no values over a limit, 1 of 12 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: form A monthly (17 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 12 reports late

Limits in force (17)

ParameterStatisticLimitMonths
BOD, 5-day, 20 deg. Cmonthly average≤ 6 mg/LMay–Nov
BOD, 5-day, 20 deg. Cdaily maximum≤ 10 mg/LMay–Nov
BOD, 5-day, 20 deg. Cmonthly average≤ 20 lb/dMay–Nov
BOD, 5-day, 20 deg. Cdaily maximum≤ 33 lb/dMay–Nov
Solids, total suspendedmonthly average≤ 6 mg/LMay–Nov
Solids, total suspendeddaily maximum≤ 10 mg/LMay–Nov
Solids, total suspendedmonthly average≤ 20 lb/dMay–Nov
Solids, total suspendeddaily maximum≤ 33 lb/dMay–Nov
Nitrogen, total [as N]monthly averagereport only (mg/L)May–Nov
Nitrogen, total [as N]daily maximumreport only (mg/L)May–Nov
Nitrogen, total [as N]monthly averagereport only (lb/d)May–Nov
Nitrogen, total [as N]daily maximumreport only (lb/d)May–Nov
Biomass, fishmonthly averagereport only (lb/d)all year
Biomass, fishdaily maximumreport only (lb/d)all year
Flow, in conduit or thru treatment plantmonthly average≤ .4 MGDall year
Formalinmonthly averagereport only (lb/d)all year
Formalindaily maximum≤ 50 lb/dall year

How strict are these limits?

Cited limits by parameter: Maine's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/ME0110523 · MCP: https://passage-data.com/mcp