Eastport City of

Sewage treatment plant, Eastport, Maine. NPDES permit ME0102148, in force until Feb 28, 2030. Last 12 months: over a limit once (last March 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: form A monthly (20 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
2 values over a limit, 0 required values missing, 0 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
March 2026Flow, in conduit or thru treatment plant, monthly average52040 gal/d≤ 50000 gal/d4%

Limits in force (20)

ParameterStatisticLimitMonths
BOD, 5-day, 20 deg. Cmonthly average≤ 203 mg/Lall year
BOD, 5-day, 20 deg. Cdaily maximumreport only (mg/L)all year
BOD, 5-day, 20 deg. Cmonthly average≤ 85 lb/dall year
BOD, 5-day, 20 deg. Cdaily maximumreport only (lb/d)all year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
Solids, total suspendedmonthly average≤ 145 mg/Lall year
Solids, total suspendeddaily maximumreport only (mg/L)all year
Solids, total suspendedmonthly average≤ 60 lb/dall year
Solids, total suspendeddaily maximumreport only (lb/d)all year
Solids, settleablemonthly averagereport only (mL/L)all year
Solids, settleabledaily maximumreport only (mL/L)all year
Fecal coliform, MPN, EC med, 44.5 Cmonthly geometric mean≤ 14 #/100mLall year
Fecal coliform, MPN, EC med, 44.5 Cdaily maximum≤ 31 #/100mLall year
Flow, in conduit or thru treatment plantmonthly average≤ 50000 gal/dall year
Chlorine, total residualdaily maximum≤ 1 mg/Lall year
BOD, percent removal [total]monthly average minimum≥ 30 %all year
Enterococcimonthly geometric mean≤ 8 MPN/100mLApr–Oct
Enterococcidaily maximum≤ 54 MPN/100mLApr–Oct
Solids, suspended percent removalmonthly average minimum≥ 50 %all year

Cited limits by parameter: Maine's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/ME0102148 · MCP: https://passage-data.com/mcp