ASHLAND WATER & SEWER DISTRICT

NPDES permit ME0101087 · Minor POTW · effective, expires 2027-05-31 · EPA's file as of 2026-09-19

Check this month's numbers before you file
Watch this permit — $79 a month. Every Monday, from EPA's newest files: the next report due and when, whether EPA's file holds your last one, any change to this permit's limits or status, and the renewal date.

EPA's record, 2025-09-01 to 2026-08-31

3values over a limit
0required values missing, on 0 form(s)
0of 12 forms filed late

Last period with anything received: 2026-08-31. Most often over: Flow, in conduit or thru treatment plant (1), pH (1), Solids, total suspended (1).

Reporting

Reports are due about 15 days after each monitoring period ends (read off this permit's own late-day counts in EPA's filings).

Limits in force (23)

OutfallParameterStatisticLimitMonths
001BOD, 5-day, 20 deg. CMO AVG <= 30 mg/L all year
001BOD, 5-day, 20 deg. CDAILY MX <= 50 mg/L all year
001BOD, 5-day, 20 deg. CMO AVG <= 75 lb/d all year
001BOD, 5-day, 20 deg. CDAILY MX <= 125 lb/d all year
001BOD, 5-day, 20 deg. CWKLY AVG <= 45 mg/L all year
001BOD, 5-day, 20 deg. CWKLY AVG <= 113 lb/d all year
001pHMINIMUM >= 6 SU all year
001pHMAXIMUM <= 9 SU all year
001Solids, total suspendedMO AVG <= 30 mg/L all year
001Solids, total suspendedDAILY MX <= 50 mg/L all year
001Solids, total suspendedMO AVG <= 75 lb/d all year
001Solids, total suspendedDAILY MX <= 125 lb/d all year
001Solids, total suspendedWKLY AVG <= 45 mg/L all year
001Solids, total suspendedWKLY AVG <= 113 lb/d all year
001E. coli, thermotol, MF, MTECMO GEO <= 64 #/100mL Apr, May, Jun, Jul, Aug, Sep, Oct
001E. coli, thermotol, MF, MTECDAILY MX <= 427 #/100mL Apr, May, Jun, Jul, Aug, Sep, Oct
001Flow, in conduit or thru treatment plantMO AVG <= .3 MGD all year
001Flow, in conduit or thru treatment plantDAILY MX report only all year
001Chlorine, total residualDAILY MX <= 1 mg/L all year
001Mercury, total [as Hg]MO AVG <= 8.97 ng/L all year
001Mercury, total [as Hg]DAILY MX <= 13.65 ng/L all year
001BOD, 5-day, percent removalMO AV MN >= 85 % all year
001Solids, suspended percent removalMO AV MN >= 85 % all year

Built from EPA's ECHO bulk files. EPA's file, not the permit document, is the source: read your permit. Check a report before you file it · All states