Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Danforth, Maine. NPDES permit ME0100161 expired Aug 31, 2026; its limits still apply. Last 12 months: over a limit 11 times (last September 2026). Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| October 2025 | pH, minimum | 5.53 SU | ≥ 6 SU | — |
| November 2025 | pH, minimum | 5.79 SU | ≥ 6 SU | — |
| March 2026 | BOD, 5-day, percent removal, monthly average minimum | 84.46 % | ≥ 85 % | 4% |
| April 2026 | BOD, 5-day, percent removal, monthly average minimum | 80.43 % | ≥ 85 % | 30% |
| April 2026 | Flow, in conduit or thru treatment plant, monthly average | .05254 MGD | ≤ .049 MGD | 7% |
| May 2026 | Flow, in conduit or thru treatment plant, monthly average | .06274 MGD | ≤ .049 MGD | 28% |
| June 2026 | pH, minimum | 5.81 SU | ≥ 6 SU | — |
| July 2026 | pH, minimum | 5.89 SU | ≥ 6 SU | — |
| August 2026 | Chlorine, total residual, daily maximum | 1.09 mg/L | ≤ 1 mg/L | 9% |
| August 2026 | pH, minimum | 5.64 SU | ≥ 6 SU | — |
| September 2026 | pH, minimum | 5.59 SU | ≥ 6 SU | — |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| BOD, 5-day, 20 deg. C | monthly average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | daily maximum | ≤ 50 mg/L | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 12 lb/d | all year |
| BOD, 5-day, 20 deg. C | daily maximum | ≤ 20 lb/d | all year |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 45 mg/L | all year |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 18 lb/d | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Solids, total suspended | monthly average | ≤ 30 mg/L | all year |
| Solids, total suspended | daily maximum | ≤ 50 mg/L | all year |
| Solids, total suspended | monthly average | ≤ 12 lb/d | all year |
| Solids, total suspended | daily maximum | ≤ 20 lb/d | all year |
| Solids, total suspended | weekly average | ≤ 45 mg/L | all year |
| Solids, total suspended | weekly average | ≤ 18 lb/d | all year |
| Solids, settleable | daily maximum | ≤ .3 mL/L | all year |
| Phosphorus, total [as P] | daily maximum | report only (ug/L) | Jun–Sep |
| E. coli, thermotol, MF, MTEC | monthly geometric mean | ≤ 64 #/100mL | May–Sep |
| E. coli, thermotol, MF, MTEC | daily maximum | ≤ 427 #/100mL | May–Sep |
| Flow, in conduit or thru treatment plant | monthly average | ≤ .049 MGD | all year |
| Chlorine, total residual | daily maximum | ≤ 1 mg/L | all year |
| Mercury, total [as Hg] | monthly average | ≤ 14.3 ng/L | all year |
| Mercury, total [as Hg] | daily maximum | ≤ 21.4 ng/L | all year |
| BOD, 5-day, percent removal | monthly average minimum | ≥ 85 % | all year |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | all year |
Cited limits by parameter: Maine's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/ME0100161 · MCP: https://passage-data.com/mcp