Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Bingham, Maine. NPDES permit ME0100056, in force until Feb 28, 2029. Last 12 months: over a limit 6 times (last November 2025). Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| November 2025 | BOD, 5-day, 20 deg. C, daily maximum | 68 mg/L | ≤ 50 mg/L | 36% |
| November 2025 | BOD, 5-day, 20 deg. C, monthly average | 46 mg/L | ≤ 30 mg/L | 53% |
| November 2025 | BOD, 5-day, 20 deg. C, monthly average | 53 lb/d | ≤ 50 lb/d | 6% |
| November 2025 | BOD, 5-day, 20 deg. C, weekly average | 68 mg/L | ≤ 45 mg/L | 51% |
| November 2025 | BOD, 5-day, 20 deg. C, weekly average | 76 lb/d | ≤ 75 lb/d | 1% |
| November 2025 | BOD, 5-day, percent removal, monthly average minimum | 71 % | ≥ 85 % | 93% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| BOD, 5-day, 20 deg. C | monthly average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | daily maximum | ≤ 50 mg/L | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 50 lb/d | all year |
| BOD, 5-day, 20 deg. C | daily maximum | ≤ 83 lb/d | all year |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 45 mg/L | all year |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 75 lb/d | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Solids, total suspended | monthly average | ≤ 30 mg/L | all year |
| Solids, total suspended | daily maximum | ≤ 50 mg/L | all year |
| Solids, total suspended | monthly average | ≤ 50 lb/d | all year |
| Solids, total suspended | daily maximum | ≤ 83 lb/d | all year |
| Solids, total suspended | weekly average | ≤ 45 mg/L | all year |
| Solids, total suspended | weekly average | ≤ 75 lb/d | all year |
| Solids, settleable | daily maximum | ≤ .3 mL/L | all year |
| E. coli, thermotol, MF, MTEC | monthly geometric mean | ≤ 64 #/100mL | Apr–Oct |
| E. coli, thermotol, MF, MTEC | daily maximum | ≤ 236 #/100mL | Apr–Oct |
| Flow, in conduit or thru treatment plant | monthly average | ≤ .2 MGD | all year |
| Flow, in conduit or thru treatment plant | daily maximum | report only (MGD) | all year |
| Chlorine, total residual | daily maximum | ≤ 1 mg/L | all year |
| Mercury, total [as Hg] | monthly average | ≤ 17.4 ng/L | all year |
| Mercury, total [as Hg] | daily maximum | ≤ 26.2 ng/L | all year |
| BOD, 5-day, percent removal | monthly average minimum | ≥ 85 % | all year |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | all year |
Cited limits by parameter: Maine's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/ME0100056 · MCP: https://passage-data.com/mcp