Passage Data · Check a report · Use it from your AI
Industrial or other facility, Sabattus, Maine. NPDES permit ME0037010, in force until May 31, 2031. Last 12 months: no values over a limit, 6 required values missing, 1 of 12 reports late. Source: EPA ECHO, Oct 22, 2026.
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| BOD, 5-day, 20 deg. C | monthly average | ≤ 30 mg/L | Apr–Oct |
| BOD, 5-day, 20 deg. C | daily maximum | ≤ 50 mg/L | Apr–Oct |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 5 lb/d | Apr–Oct |
| BOD, 5-day, 20 deg. C | daily maximum | ≤ 8.3 lb/d | Apr–Oct |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 45 mg/L | Apr–Oct |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 7.5 lb/d | Apr–Oct |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Solids, total suspended | monthly average | ≤ 30 mg/L | Apr–Oct |
| Solids, total suspended | daily maximum | ≤ 50 mg/L | Apr–Oct |
| Solids, total suspended | monthly average | ≤ 5 lb/d | Apr–Oct |
| Solids, total suspended | daily maximum | ≤ 8.3 lb/d | Apr–Oct |
| Solids, total suspended | weekly average | ≤ 45 mg/L | Apr–Oct |
| Solids, total suspended | weekly average | ≤ 7.5 lb/d | Apr–Oct |
| Solids, settleable | daily maximum | ≤ .3 mL/L | all year |
| Phosphorus, total [as P] | monthly average | report only (mg/L) | Jun–Sep |
| Phosphorus, total [as P] | daily maximum | report only (mg/L) | Jun–Sep |
| Phosphorus, total [as P] | monthly average | report only (lb/d) | Jun–Sep |
| Phosphorus, total [as P] | daily maximum | report only (lb/d) | Jun–Sep |
| Phosphorus, total [as P] | monthly average | report only (mg/L) | Jun–Sep |
| Phosphorus, total [as P] | daily maximum | report only (mg/L) | Jun–Sep |
| E. coli, thermotol, MF, MTEC | monthly geometric mean | ≤ 100 #/100mL | Apr–Oct |
| E. coli, thermotol, MF, MTEC | daily maximum | ≤ 236 #/100mL | Apr–Oct |
| Flow, in conduit or thru treatment plant | daily maximum | ≤ 20000 gal/d | all year |
| Chlorine, total residual | daily maximum | ≤ 1 mg/L | all year |
| BOD, 5-day, percent removal | monthly average minimum | ≥ 85 % | May–Oct |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | May–Oct |
Cited limits by parameter: Maine's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/ME0037010 · MCP: https://passage-data.com/mcp