Passage Data · Check a report · Use it from your AI

Ocean Gate Inn, LLC

Hotels And Motels, Southport, Maine. NPDES permit ME0036862, in force until Jan 31, 2027. Last 12 months: over a limit 7 times (last September 2026), 1 of 8 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: form A monthly (23 values)
Renewal application due
Aug 4, 2026 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
12 values over a limit, 0 required values missing, 1 of 8 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
July 2026Enterococci, monthly geometric mean16 #/100mL≤ 8 #/100mL100%
August 2026Enterococci, daily maximum1553 #/100mL≤ 54 #/100mL2776%
August 2026Enterococci, monthly geometric mean233 #/100mL≤ 8 #/100mL2813%
September 2026BOD, 5-day, 20 deg. C, daily maximum109 mg/L≤ 50 mg/L118%
September 2026BOD, 5-day, 20 deg. C, monthly average109 mg/L≤ 30 mg/L263%
September 2026BOD, 5-day, 20 deg. C, weekly average109 mg/L≤ 45 mg/L142%
September 2026BOD, 5-day, percent removal, monthly average minimum61.8 %≥ 85 %155%

Limits in force (23)

ParameterStatisticLimitMonths
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/LApr–Nov
BOD, 5-day, 20 deg. Cdaily maximum≤ 50 mg/LApr–Nov
BOD, 5-day, 20 deg. Cmonthly average≤ 1.3 lb/dApr–Nov
BOD, 5-day, 20 deg. Cdaily maximum≤ 2.1 lb/dApr–Nov
BOD, 5-day, 20 deg. Cweekly average≤ 45 mg/LApr–Nov
BOD, 5-day, 20 deg. Cweekly average≤ 1.9 lb/dApr–Nov
pHminimum≥ 6 SUApr–Nov
pHmaximum≤ 9 SUApr–Nov
Solids, total suspendedmonthly average≤ 30 mg/LApr–Nov
Solids, total suspendeddaily maximum≤ 50 mg/LApr–Nov
Solids, total suspendedmonthly average≤ 1.3 lb/dApr–Nov
Solids, total suspendeddaily maximum≤ 2.1 lb/dApr–Nov
Solids, total suspendedweekly average≤ 45 mg/LApr–Nov
Solids, total suspendedweekly average≤ 1.9 lb/dApr–Nov
Coliform, fecal MF, MFC broth, 44.5 Cmonthly geometric mean≤ 14 #/100mLApr–Nov
Coliform, fecal MF, MFC broth, 44.5 Cdaily maximum≤ 31 #/100mLApr–Nov
Flow, in conduit or thru treatment plantmonthly averagereport only (gal/d)Apr–Nov
Flow, in conduit or thru treatment plantdaily maximum≤ 5000 gal/dApr–Nov
Chlorine, total residualdaily maximum≤ 1 mg/LApr–Nov
Enterococcimonthly geometric mean≤ 8 #/100mLApr–Oct
Enterococcidaily maximum≤ 54 #/100mLApr–Oct
BOD, 5-day, percent removalmonthly average minimum≥ 85 %Apr–Nov
Solids, suspended percent removalmonthly average minimum≥ 85 %Apr–Nov

How strict are these limits?

Cited limits by parameter: Maine's rules and the federal ones.

Same industry: the 15 Hotels, Rooming Houses, Camps and Other Lodging permits in Maine.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/ME0036862 · MCP: https://passage-data.com/mcp