Passage Data · Check a report · Use it from your AI

Regenerate Livermore Falls LLC

Electric Services, Livermore Falls, Maine. NPDES permit ME0023710, in force until Mar 31, 2031. Last 12 months: over a limit 2 times (last August 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: form E monthly (23 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 1 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
August 2026Solids, total suspended, daily maximum67.5 mg/L≤ 50 mg/L35%
August 2026Solids, total suspended, monthly average33.8 mg/L≤ 30 mg/L13%

Limits in force (23)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheitdaily maximum≤ 90 deg FJun–Sep
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspendeddaily maximum≤ 50 mg/Lall year
Solids, total suspendedmonthly average≤ 34 lb/dall year
Solids, total suspendeddaily maximum≤ 73 lb/dall year
Oil & Greasemonthly average≤ 15 mg/Lall year
Oil & Greasedaily maximum≤ 15 mg/Lall year
Chromium, total [as Cr]monthly average≤ .2 mg/Lall year
Chromium, total [as Cr]daily maximum≤ .2 mg/Lall year
Chromium, total [as Cr]monthly average≤ .23 lb/dall year
Chromium, total [as Cr]daily maximum≤ .29 lb/dall year
Zinc, total [as Zn]monthly average≤ 1 mg/Lall year
Zinc, total [as Zn]daily maximum≤ 1 mg/Lall year
Zinc, total [as Zn]monthly average≤ 1.2 lb/dall year
Zinc, total [as Zn]daily maximum≤ 1.4 lb/dall year
Flow, in conduit or thru treatment plantmonthly average≤ .138 MGDall year
Flow, in conduit or thru treatment plantdaily maximum≤ .175 MGDall year
Chlorine, free availablemonthly average≤ .2 mg/Lall year
Chlorine, free availabledaily maximum≤ .5 mg/Lall year
Mercury, total [as Hg]monthly average≤ 25 ng/Lall year
Mercury, total [as Hg]daily maximum≤ 37.5 ng/Lall year

How strict are these limits?

Cited limits by parameter: Maine's rules and the federal ones.

Same industry: the 6 Electric Services permits in Maine.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/ME0023710 · MCP: https://passage-data.com/mcp