Passage Data · Check a report · Use it from your AI

Ne Renewable Power West Enfield LLC

Electric Services, West Enfield, Maine. NPDES permit ME0023213, in force until Dec 31, 2026. Last 12 months: over a limit 3 times (last January 2026), 2 of 36 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: outfall 001 form A monthly (10 values), outfall 002 form A monthly (8 values), outfall 003 form A monthly (6 values)
Renewal application due
Jul 4, 2026 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 1 of 36 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingOutfallParameterReportedLimitOver by
November 2025002Oil and grease, hexane extr method, daily maximum32 mg/L≤ 20 mg/L60%
November 2025002Oil and grease, hexane extr method, monthly average16 mg/L≤ 15 mg/L7%
January 2026003Solids, total suspended, monthly average33.5 mg/L≤ 30 mg/L12%

Limits in force (24)

ParameterStatisticLimitMonthsOutfall
Temperature, water deg. fahrenheitdaily maximum≤ 85 deg FJun–Sep001
pHminimum≥ 6 SUall year001
pHmaximum≤ 9 SUall year001
Chromium, total [as Cr]monthly average≤ .2 mg/Lall year001
Chromium, total [as Cr]daily maximum≤ .2 mg/Lall year001
Zinc, total [as Zn]monthly average≤ 1 mg/Lall year001
Zinc, total [as Zn]daily maximum≤ 1 mg/Lall year001
Flow, in conduit or thru treatment plantdaily maximum≤ 150000 gal/dall year001
Chlorine, free availablemonthly average≤ .2 mg/Lall year001
Chlorine, free availabledaily maximum≤ .5 mg/Lall year001
Temperature, water deg. fahrenheitdaily maximum≤ 80 deg FJun–Sep002
pHminimum≥ 6 SUall year002
pHmaximum≤ 9 SUall year002
Solids, total suspendedmonthly average≤ 30 mg/Lall year002
Solids, total suspendeddaily maximum≤ 100 mg/Lall year002
Oil and grease, hexane extr methodmonthly average≤ 15 mg/Lall year002
Oil and grease, hexane extr methoddaily maximum≤ 20 mg/Lall year002
Flow, in conduit or thru treatment plantdaily maximum≤ 1000 gal/dall year002
pHminimum≥ 6 SUall year003
pHmaximum≤ 9 SUall year003
Solids, total suspendedmonthly average≤ 30 mg/Lall year003
Solids, total suspendeddaily maximum≤ 100 mg/Lall year003
Flow, in conduit or thru treatment plantmonthly averagereport only (gal/d)all year003
Flow, in conduit or thru treatment plantdaily maximum≤ 36000 gal/dall year003

How strict are these limits?

Cited limits by parameter: Maine's rules and the federal ones.

Same industry: the 6 Electric Services permits in Maine.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/ME0023213 · MCP: https://passage-data.com/mcp