NPDES permit ME0001911 · Minor NON-POTW · effective, expires 2031-05-31 · EPA's file as of 2026-09-19
Check this month's numbers before you fileLast period with anything received: 2026-07-31. Most often over: Flow, in conduit or thru treatment plant (1).
Reports are due about 15 days after each monitoring period ends (the most common figure among ME permits in EPA's filings — check your permit).
| Outfall | Parameter | Statistic | Limit | Months |
|---|---|---|---|---|
| 001 | Temperature, water deg. fahrenheit | DAILY MX | <= 90 deg F | Jun, Jul, Aug, Sep |
| 001 | Flow, in conduit or thru treatment plant | DAILY MX | <= .042 MGD | Jun, Jul, Aug, Sep |
| 002 | Temperature, water deg. fahrenheit | DAILY MX | <= 90 deg F | Jun, Jul, Aug, Sep |
| 002 | Flow, in conduit or thru treatment plant | DAILY MX | <= .043 MGD | Jun, Jul, Aug, Sep |
| 003 | Temp. difference, summer [deg. F] | WKLY AVG | <= .5 deg F | all year |
| 003 | Temp. difference, summer [deg. F] | DAILY MX | <= .5 deg F | all year |
Built from EPA's ECHO bulk files. EPA's file, not the permit document, is the source: read your permit. Check a report before you file it · All states