Passage Data · Check a report · Use it from your AI

Portsmouth Naval Shipyard

Federal facility (Ship Building And Repairing), Kittery, Maine. NPDES permit ME0000868, in force until May 31, 2027. Last 12 months: no values over a limit, 3 of 36 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: outfall 001 form A monthly (7 values), outfall 002 form A monthly (7 values), outfall 003 form A monthly (7 values)
Renewal application due
Dec 2, 2026 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 36 reports late

Limits in force (21)

ParameterStatisticLimitMonthsOutfall
pHminimum≥ 6 SUall year001
pHmaximum≤ 9 SUall year001
Solids, total suspendedmonthly average≤ 50 mg/Lall year001
Solids, total suspendeddaily maximum≤ 100 mg/Lall year001
Oil and grease, hexane extr methoddaily maximum≤ 15 mg/Lall year001
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
pHminimum≥ 6 SUall year002
pHmaximum≤ 9 SUall year002
Solids, total suspendedmonthly average≤ 50 mg/Lall year002
Solids, total suspendeddaily maximum≤ 100 mg/Lall year002
Oil and grease, hexane extr methoddaily maximum≤ 15 mg/Lall year002
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year002
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year002
pHminimum≥ 6 SUall year003
pHmaximum≤ 9 SUall year003
Solids, total suspendedmonthly average≤ 50 mg/Lall year003
Solids, total suspendeddaily maximum≤ 100 mg/Lall year003
Oil and grease, hexane extr methoddaily maximum≤ 15 mg/Lall year003
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year003
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year003

Cited limits by parameter: Maine's rules and the federal ones.

Same industry: the 4 Transportation Equipment permits in Maine.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/ME0000868 · MCP: https://passage-data.com/mcp