Passage Data · Check a report · Use it from your AI

City of Frostburg

Water Supply, Frostburg, Maryland. NPDES permit MD0063487, in force until May 31, 2030. Last 12 months: no values over a limit, 1 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A monthly (11 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 12 reports late

Limits in force (11)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheitmaximumreport only (deg F)all year
pHminimum≥ 6.5 SUall year
pHmaximum≤ 8.5 SUall year
Solids, total suspendedmaximum monthly average≤ 20 mg/Lall year
Solids, total suspendeddaily maximum≤ 30 mg/Lall year
Aluminum, total recoverablemaximum monthly average≤ 1.2 mg/Lall year
Aluminum, total recoverabledaily maximum≤ 1.8 mg/Lall year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Chlorine, total residualmaximum monthly average≤ .011 mg/Lall year
Chlorine, total residualdaily maximum< .019 mg/Lall year

How strict are these limits?

Cited limits by parameter: Maryland's rules and the federal ones.

Same industry: the 18 Water Supply permits in Maryland.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MD0063487 · MCP: https://passage-data.com/mcp