Passage Data · Check a report · Use it from your AI

Montebello W.T.P.

Water Supply, Baltimore, Maryland. NPDES permit MD0003042 expired May 31, 2024; its limits still apply. Last 12 months: over a limit 4 times (last August 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A monthly (9 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
February 2026Chlorine, total residual, maximum.136 mg/L≤ .1 mg/L36%
July 2026Solids, total suspended, maximum monthly average71.5 mg/L≤ 20 mg/L258%
July 2026Solids, total suspended, maximum daily average272 mg/L≤ 30 mg/L807%
August 2026Solids, total suspended, maximum daily average37.6 mg/L≤ 30 mg/L25%

Limits in force (9)

ParameterStatisticLimitMonths
pHminimum≥ 6.5 SUall year
pHmaximum≤ 8.5 SUall year
Solids, total suspendedmaximum monthly average≤ 20 mg/Lall year
Solids, total suspendedmaximum daily average≤ 30 mg/Lall year
Aluminum, total recoverablemaximum monthly average≤ 1 mg/Lall year
Aluminum, total recoverablemaximum daily average≤ 2 mg/Lall year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualmaximum≤ .1 mg/Lall year

How strict are these limits?

Cited limits by parameter: Maryland's rules and the federal ones.

Same industry: the 18 Water Supply permits in Maryland.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/MD0003042 · MCP: https://passage-data.com/mcp