Frank Miller Lumber Company

NPDES permit INRM03111 · Minor NON-POTW · effective, expires 2029-02-21 · EPA's file as of 2026-09-19

Check this month's numbers before you file
Watch this permit — $79 a month. Every Monday, from EPA's newest files: the next report due and when, whether EPA's file holds your last one, any change to this permit's limits or status, and the renewal date.

EPA's record, 2025-09-01 to 2026-08-31

0values over a limit
0required values missing, on 0 form(s)
0of 2 forms filed late

Last period with anything received: 2026-02-21.

Reporting

Reports are due about 35 days after each monitoring period ends (read off this permit's own late-day counts in EPA's filings).

Limits in force (16)

OutfallParameterStatisticLimitMonths
001pHMAXIMUM report only Feb
001Solids, total suspendedMAXIMUM report only Feb
001Oil and grease, hexane extr methodMAXIMUM report only Feb
001Nitrogen, Kjeldahl, total [as N]MAXIMUM report only Feb
001Nitrite + Nitrate total [as N]MAXIMUM report only Feb
001Phosphorus, total [as P]MAXIMUM report only Feb
001BOD, carbonaceous [5 day, 20 C]MAXIMUM report only Feb
001Chemical Oxygen Demand [COD]MAXIMUM report only Feb
002pHMAXIMUM report only Feb
002Solids, total suspendedMAXIMUM report only Feb
002Oil and grease, hexane extr methodMAXIMUM report only Feb
002Nitrogen, Kjeldahl, total [as N]MAXIMUM report only Feb
002Nitrite + Nitrate total [as N]MAXIMUM report only Feb
002Phosphorus, total [as P]MAXIMUM report only Feb
002BOD, carbonaceous [5 day, 20 C]MAXIMUM report only Feb
002Chemical Oxygen Demand [COD]MAXIMUM report only Feb

Built from EPA's ECHO bulk files. EPA's file, not the permit document, is the source: read your permit. Check a report before you file it · All states