Passage Data · Check a report · Use it from your AI

Irving Materials Inc New Castle

Ready-Mixed Concrete, New Castle, Indiana. NPDES permit INRM00481, in force until Sep 20, 2031. No reports in EPA's file for the last 12 months. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form RA yearly
Last report on file
None in EPA's file for the last 12 months; that may be EPA's gap, not the facility's

Limits in force (8)

ParameterStatisticLimitMonths
pHmaximumreport only (SU) (alert, not enforceable)Sep
Solids, total suspendedmaximumreport only (mg/L) (alert, not enforceable)Sep
Oil and grease, hexane extr methodmaximumreport only (mg/L) (alert, not enforceable)Sep
Nitrogen, Kjeldahl, total [as N]maximumreport only (mg/L) (alert, not enforceable)Sep
Nitrite + Nitrate total [as N]maximumreport only (mg/L) (alert, not enforceable)Sep
Phosphorus, total [as P]maximumreport only (mg/L) (alert, not enforceable)Sep
BOD, carbonaceous [5 day, 20 C]maximumreport only (mg/L) (alert, not enforceable)Sep
Chemical Oxygen Demand [COD]maximumreport only (mg/L) (alert, not enforceable)Sep

Cited limits by parameter: Indiana's rules and the federal ones.

Same industry: the 80 Stone, Clay, Glass and Concrete Products permits in Indiana.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/INRM00481 · MCP: https://passage-data.com/mcp