Passage Data · Check a report · Use it from your AI

Marseilles Land and Water Company

Heavy Construction, Marseilles, Illinois. NPDES permit IL0080066, in force until Aug 31, 2030. Last 12 months: no values over a limit, 2 of 24 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 25 days after each period: outfall 001 form 0 monthly (8 values), outfall 002 form 0 monthly (8 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 4 of 24 reports late

Limits in force (16)

ParameterStatisticLimitMonthsOutfall
pHmonthly minimum≥ 6 SUall year001
pHmonthly maximum≤ 9 SUall year001
Solids, total suspended30-day average≤ 15 mg/Lall year001
Solids, total suspendeddaily maximum≤ 30 mg/Lall year001
Benzenedaily maximum≤ .05 mg/Lall year001
Priority Pollutantsdaily maximum≤ .1 mg/Lall year001
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
pHmonthly minimum≥ 6 SUall year002
pHmonthly maximum≤ 9 SUall year002
Solids, total suspended30-day average≤ 15 mg/Lall year002
Solids, total suspendeddaily maximum≤ 30 mg/Lall year002
Benzenedaily maximum≤ .05 mg/Lall year002
Priority Pollutantsdaily maximum≤ .1 mg/Lall year002
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year002
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year002

How strict are these limits?

Cited limits by parameter: Illinois's rules and the federal ones.

Same industry: the 3 Heavy Construction permits in Illinois.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/IL0080066 · MCP: https://passage-data.com/mcp