Passage Data · Check a report · Use it from your AI

Calumet Energy Facility

Electric Services, Chicago, Illinois. NPDES permit IL0075108, in force until Jul 31, 2030. Last 12 months: over a limit once (last July 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 25 days after each period: outfall 001 form 0 monthly (10 values), outfall 002 form 0 monthly (10 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
1 value over a limit, 0 required values missing, 0 of 24 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
July 2026Chlorine, total residual, daily maximum.06 mg/L≤ .05 mg/L20%

Limits in force (22)

ParameterStatisticLimitMonthsOutfall
Temperature, water deg. fahrenheitmonthly maximum≤ 63 deg FJan, Feb, Mar, Dec001
Temperature, water deg. fahrenheitmonthly maximum≤ 93 deg FApr–Nov001
pHmonthly minimum≥ 6 SUall year001
pHmonthly maximum≤ 9 SUall year001
Solids, total suspended30-day average≤ 15 mg/Lall year001
Solids, total suspendeddaily maximum≤ 30 mg/Lall year001
Oil and grease30-day average≤ 15 mg/Lall year001
Oil and greasedaily maximum≤ 30 mg/Lall year001
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
Chlorine, total residualdaily maximum≤ .05 mg/Lall year001
Temperature, water deg. fahrenheitmonthly maximum≤ 63 deg FJan, Feb, Mar, Dec002
Temperature, water deg. fahrenheitmonthly maximum≤ 93 deg FApr–Nov002
pHmonthly minimum≥ 6 SUall year002
pHmonthly maximum≤ 9 SUall year002
Solids, total suspended30-day average≤ 15 mg/Lall year002
Solids, total suspendeddaily maximum≤ 30 mg/Lall year002
Oil and grease30-day average≤ 15 mg/Lall year002
Oil and greasedaily maximum≤ 30 mg/Lall year002
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year002
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year002
Chlorine, total residualdaily maximum≤ .05 mg/Lall year002

How strict are these limits?

Cited limits by parameter: Illinois's rules and the federal ones.

Same industry: the 45 Electric Services permits in Illinois.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/IL0075108 · MCP: https://passage-data.com/mcp